Bruce Phase II was discovered in North Sea in 1997 and production from
by operator BP.
Bruce Phase II, UK
Subsea Field Development Data:
Area:
North Sea
Block:
9/8a, 9/9a and 9/9b
Country:
UK
Region:
Europe(North)
Operator:
BP
Partners:
Topside Solution:
Bruce Phase IIFixed Platform
Subsea Solution:
Drilling template
Development Cost:
Oil Gas Reserves:
Bruce Phase II, BP[/b], - field was originally developed under Phase I, using two bridge-linked platforms, both connected to the main 52in Frigg trunkline by a 6km, 32in-diameter gas-export pipeline.
The Bruce Phase II field development by operator BP is located 9/8a, 9/9a and 9/9b in North Sea offshore UK
in water depths of 121 metres.
BP with its partners started development of the Bruce Phase II field in 1997.
The recoverable reserves are estimated to . Number of subsea wells are 13. The production year is
with a daily production estimate of 14 million barrels . The Bruce Phase II project is based on a Drilling template
subsea solution with Bruce Phase IIFixed Platform topside solution. The development cost is in the order of with an estimated field life of 25 years.
Bruce Phase II
Technical Information:
No of Wells:
13
Crude:
Water Depth:
121 metres
Design Pressure:
Design Temperature:
99 deg c
Field Life:
25
Bruce Phase II Project Status:
Daily Production: 14 million barrels
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
by operator BP.
Bruce Phase II, UK
Subsea Field Development Data:
Area:
North Sea
Block:
9/8a, 9/9a and 9/9b
Country:
UK
Region:
Europe(North)
Operator:
BP
Partners:
Topside Solution:
Bruce Phase IIFixed Platform
Subsea Solution:
Drilling template
Development Cost:
Oil Gas Reserves:
Bruce Phase II, BP[/b], - field was originally developed under Phase I, using two bridge-linked platforms, both connected to the main 52in Frigg trunkline by a 6km, 32in-diameter gas-export pipeline.
The Bruce Phase II field development by operator BP is located 9/8a, 9/9a and 9/9b in North Sea offshore UK
in water depths of 121 metres.
BP with its partners started development of the Bruce Phase II field in 1997.
The recoverable reserves are estimated to . Number of subsea wells are 13. The production year is
with a daily production estimate of 14 million barrels . The Bruce Phase II project is based on a Drilling template
subsea solution with Bruce Phase IIFixed Platform topside solution. The development cost is in the order of with an estimated field life of 25 years.
Bruce Phase II
Technical Information:
No of Wells:
13
Crude:
Water Depth:
121 metres
Design Pressure:
Design Temperature:
99 deg c
Field Life:
25
Bruce Phase II Project Status:
Daily Production: 14 million barrels
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")